Walls built in a factory.
Installed in days.
The APEX Speed Wall™ replaces blockwork, drylining and steel-framed systems with one dry, factory-made panel. Paint-ready, insulated, and cut to your programme.
One system, three ways to use it
Panel supply
Speed Wall panels manufactured to your project schedule and delivered to site, ready to fix.
Panel range →Turnkey walls
Our trained crews install, joint and finish. One package from setting-out to handover.
Discuss a project →System Homes
Light-gauge steel frame and Speed Wall walls combined into a complete modular housing system.
System Homes →One factory-made panel does the job of an entire wall build-up
- Faces
- High-density cement fibre, water-resistant and paint-ready
- Core
- Proprietary lightweight high-specification core
- Edge
- Tongue and groove, interlocking to one monolithic plane
- Replaces
- Blockwork, drylining, SFS, insulation, plaster and lintels
Straight, true and ready to finish



Fewer trades. Less waiting. Cleaner sites.
Blockwork needs mortar, lintels, render and drying time. A Speed Wall goes up dry, takes services in the wall depth, and only the joints need finishing before paint.
| Specification | APEX Speed Wall™ | Plasterboard | AAC block |
|---|---|---|---|
| Fire rating | 4 hours + | 2 hours | Max 3 hours |
| Acoustic | 43–65 dB | Varies | Up to 39 dB |
| Direct pull-out | 1,800–2,000 N | Up to 710 N | Up to 320 N |
| U-value (W/m²K) | 0.16–0.36 | 2.3–2.8 | 0.3–0.4 |
| Compressive (N/mm²) | 5.5 | 1.3–3.5 | 3.0–4.0 |
| Wet areas | Acceptable | Needs treatment | Needs treatment |
| Plaster, wet trades, lintels | Not required | Required | Required |
| Site wastage | ~3% | ~25% | ~20% |
Indicative values from tested system configurations. Certified performance is assembly-specific.
Selected clients our team has worked with
Over 5 million m² of the system installed internationally, from 60-storey commercial towers to large residential schemes.